FERC Online eLibrary (formerly FERRIS)
 http://www.ferc.gov
  
   
\n
skip navigation links

Search

Advanced Search

New Dockets

Docket Search

Daily Search

Request List

Logon

Help

Help - Accessible

Login: Guest


 


E-mail this page

File List

 
Accession Number:   20130722-5169
Description:   Elba Liquefaction Company, L.L.C., Southern LNG Company, L.L.C and and Elba Express Company, L.L.C's Draft Resource Reports 1 through 6 (Appendix 6.A) for the Elba Liquefaction Project under PF13-3.

 
  Type   File Name Size  
FERC Generated PDF    
      11525239.PDF 38710484  

All Mixed Format    
    Cover Letter Draft RRs 1-12.PDF 1323412  
            Draft Resource Reports 1 through 12
    FERC_Comments Summary Table cel 07-19-13 Final.PDF 44874  
            Draft Resource Reports 1 through 12
    RR01_General Project Description_Draft_Final_07182013.PDF 462257  
            Draft Resource Reports 1 through 12
    Appendix_1.A_Regulatory_Correspondence_DS.PDF 9445105  
            Draft Resource Reports 1 through 12
    Appendix_1.B_Project Figures and Mapping.PDF 6704566  
            Draft Resource Reports 1 through 12
    Figure 1.1-2 Sea Buoy Location [D-Size].PDF 2889624  
            Draft Resource Reports 1 through 12
    Fort Pulaski.PDF 1337619  
            Draft Resource Reports 1 through 12
    Savannah [D-Size].PDF 1670961  
            Draft Resource Reports 1 through 12
    RR02_Water Use and Quality_Draft_Final_07182013.PDF 737752  
            Draft Resource Reports 1 through 12
    Appendix_2.A_2013 FERC Wetl Waterb ConstrMitigatio.PDF 87002  
            Draft Resource Reports 1 through 12
    Appendix_2.B_SPCC Plan_07182013.PDF 153014  
            Draft Resource Reports 1 through 12
    Appendix_2.C_Elba Liquefaction Field .PDF 12155068  
            Draft Resource Reports 1 through 12
    RR03_Fish Wildlife and Vegetation_Draft_Final_07182013.PDF 695050  
            Draft Resource Reports 1 through 12
    Appendix_3.A_Elba Liquefaction Field Survey.PDF 5729139  
            Draft Resource Reports 1 through 12
    RR04_Cultural Resources_Draft_Final_07182013.DOCX 116330  
            Draft Resource Reports 1 through 12
    Appendix_4.A_SHPO and Native American Corre.PDF 1992040  
            Draft Resource Reports 1 through 12
    Appendix_4.B_Unanticipated Discoveries Plan.PDF 46386  
            Draft Resource Reports 1 through 12
    RR05_Socioeconomics_Draft_Final_07172013.PDF 368292  
            Draft Resource Reports 1 through 12
    Appendix_5.A_Elba Island Facilities Map.PDF 414760  
            Draft Resource Reports 1 through 12
    Appendix_5.B_Georgia Department of Transt.PDF 207780  
            Draft Resource Reports 1 through 12
    RR06_Geological Resources_Draft_Final_07172013.PDF 1985496  
            Draft Resource Reports 1 through 12